Project: Mhardeh Power Plant

Major energy projects are not built in a vacuum; they are meticulously planned on the ground. Our engineering consultancy team conducted a comprehensive topographic survey of the Mhardeh Power Plant using state-of-the-art GPS (RTK) equipment.
What we did:
Recorded and determined the geographic coordinates (X, Y, Z) of the main control points.
Established specific control points covering the entire project site.
Conducted a detailed topographic survey to serve as the foundation for all subsequent structural and architectural designs.
Why is precision important?
To ensure full compliance with international engineering standards, accurately calculate excavation and backfilling quantities, and determine the foundation levels for the plant's bases and heavy equipment.
Project: Mhardeh Power Plant

See More
...
Deir ez-Zor Power Plant Project

From the heart of Deir ez-Zor, we continue work on one of the largest power plants. In strategic projects of this scale, we don't settle for mere surveying; we prioritize precision as the cornerstone of every construction step.
Our Methodology:
To achieve the highest technical quality standards, we have integrated advanced monitoring methods:
1- Establishing the Reference Baseline with Static Mode: This mode is the "measure of accuracy" in our project. 
2- Implementing the Basic & Rover Mode: Based on the accuracy achieved with Static Mode, we transition to real-time work by positioning the base at these reliable points and using the Rover to ensure rapid on-site execution while maintaining complete alignment with the local network without any shifts.